Hi All,
We have an Exchange 2010 Environment with DPM 2010 Backup solution. We have three Mailbox Servers in our Environment.
I have created One protection Group for all three Mailbox Servers database backup. I configured only passive database copies to take the backup.
Every day, we taking the Incremental Backup via 24 hours sync frequency.
When the backup starts at 12 AM, Only three database backups are running at a time. Rest of the jobs are in pending state. But we need to run multiple jobs at time through schdule.
Is ther any way, we can configure PG to run multiple jobs at a time for the Mailbox Server Backup ?
Regards
Manoj