Hello to all!
I'm puzzling over a problem that I am facing with DPM 2010.
My DPM is configured to backup my databases exchange server 2010 sp1 it is in DAG.
I'm assuming a critical environment and possess little knowledge on the tool. When checking these bases Protection Group, found that a basic critique was not backed up, unfortunately I discovered this when I needed to restore a mailbox that base.
Well, frustrations aside, I want to avoid the same in future. Include this database in Protection Group, and after completing the process of inclusion, based on question (MBX09DB03) got the status: REPLICA CREATION IN PROGRESS as picture below:
Well, after the creation of the replica, it was OK with status as the other in the figure above. So I tried to start the backup process FULL of it (of course). Right clicked on that foundation and clicked CREATE RECOVERY POINT. I selected the option "... EXPRESS FULL BACKUP" appears the error message below:
The question that I leave is: what is missing for me to successfully perform this backup?
Thanks in advance for the help of the community.
Albert Alberico dos Santos